For a thick or failed coating, a scarifier machine gets it off faster. Our GT250 mills 1 to 4 mm from the surface with a drum of 108 cutters, while a floor grinder such as the S300 is the quicker route to a coat-ready finish on a slab that is already sound.
How do the GT250 scarifier and the S300 grinder compare?
| Point | GT250 scarifier | S300 epoxy flooring grinder |
|---|---|---|
| How it works | Drum with 108 cutters mills the surface | Grinding head at 1450 rpm abrades the surface |
| Working width | 250 mm | 300 mm |
| Removal | Milling depth 1 to 4 mm | Laitance, coating residue and contamination |
| Surface left behind | Textured, for a bonded screed or overlay | Flatter, finer profile for a thin coating |
| Dust collection | None listed | Built-in vacuum: 180 m³/h, 207 mBar, 16 L |
| Power | 415 V, 50/60 Hz, 3 phase | 5 Hp grinder on 380 V 3 phase 50 Hz; vacuum on 220 V, 4.5 A |
| Weight | 140 kg | 102 kg |
Which machine removes an old epoxy coating faster?
It depends on how much there is to remove. Where there is real thickness to take off, such as a failed epoxy system, thermoplastic road lines, a lip at a slab joint or a weathered top, the GT250 gets through it in far fewer passes. A grinder can do the same job, but it wears the coating away rather than cutting it out, so on a thick layer it needs many more passes.
Where the old coating has mostly gone and the slab is sound, the S300 is the faster choice, because it removes the residue and leaves the profile a new coat needs in the same pass.
On the GT250, set the depth to the job, not to the maximum. Two passes at a moderate setting usually finish sooner than one heavy pass, which slows the machine and wears the cutters faster.
What surface does each machine leave behind?
This matters as much as speed, because the next layer has to bond to it.
- GT250: a textured, milled surface. At about 1 mm it opens up laitance and gives a key for a coating. Towards 4 mm it strips coatings and levels steps between slabs. That texture suits a bonded screed or topping.
- S300: a flatter, finer profile. This is what a thin epoxy or PU system needs, since a coat of that thickness will show every ridge left underneath it.
So if a thin coating is going back down, do not stop after scarifying.
When should you use both, and in what order?
Contractors who take on both kinds of floor often run the two together. The usual order:
- Mark the repair area. If its edge needs a clean line, cut it first with a concrete cutter; the scarifier then clears the area inside it.
- Scarify with the GT250 in moderate passes until the old coating and any lips are gone.
- Follow with the S300 to flatten the milled texture into an even profile.
- Empty the S300's 16 L collector at regular intervals so suction stays up through the shift.
- Prime once the floor is clean and dry.
The 108 cutters on the GT250 are wear parts and are replaced as a full set, so the drum stays balanced. Cutter sets are held in our Delhi stock. For the S300, the right tooling depends on the floor and the coating; we cover it during commissioning and operator training, so ask us when you order.
Which one suits a floor that stays in use?
Coating work often happens in buildings that keep running: a factory line, a hospital wing, a food or pharmaceutical plant. Dry work without extraction is not acceptable there. The S300's on-board vacuum keeps dust at the grinding head, so the floor is ready for priming rather than a clean-down. The GT250 page lists no dust extraction, so plan dust control for the scarifying stage before work starts, and ask us what suits your site.
What if the floor is too large for a 250 or 300 mm machine?
Both machines are sized for room-by-room preparation and for working around columns and plant. For large open floors, heavy grinding or polished concrete, a bigger planetary grinder covers more area per hour. Our guide to choosing a floor grinding machine explains how to pick one by job and floor area.
Full specifications are on the GT250 scarifier machine and S300 epoxy flooring grinder pages. Tell us the coating, roughly how thick it is and what goes down next, and we will suggest the machine, or the pair, for your floor.
Get a price for your job
Tell us the material, the area and the specification you have to meet. We will come back with the right machine, the price and the delivery date — usually the same working day.